Preparation for Bricklaying Training

Print   

09 Aug 2017

Disclaimer:
This essay has been written and submitted by students and is not an example of our work. Please click this link to view samples of our professional work witten by our professional essay writers. Any opinions, findings, conclusions or recommendations expressed in this material are those of the authors and do not necessarily reflect the views of EssayCompany.

  1. Introduction

The purpose of this document is to identify and confirm the general methodology by which W.A.T.A will carry out bricklaying training at WATA, Old Hartford Road, Houghton

WATA recognise the importance of carrying out the work in a safe and controlled manner and ensuring that strict supervision and control measures are maintained throughout the work. WATA will therefore provide the necessary project management and site supervision to ensure that the highest quality, health and safety standards are implemented and maintained throughout the training course

All WATA and subcontract personnel will be competent to carry out their designated tasks during the work. Before commencing work on site, all personnel will receive a site induction, a copy of site rules and a briefing on all relevant health, safety and welfare matters.

2.0 Scope of Works

The SOW (Scope of Work) covered by this document is bricklaying using lime mortar

Brick laying

3.0 References

This document should be referenced with the following: Risk assessment 001

3.5 Appendices

Risk Assessment 001 Lime Mortar, 002Slips,Trips and Falls,  003 Use of small power tools  004 Manual Handling

4.0 Health & Safety / Environmental

All personnel and visitors to site will undergo a site induction prior to accessing the works.

4.1 Lifting Operations

N/A

4.2 COSHH

Lime Mortar

4.3 First Aid

First aid provision on site at all times, WATA first aider in attendance at all times

4.4 Fire

All trainees will be shown fire routes and assembly areas

4.5 RIDDOR

All reporting of accidents and incidents will be in accordance with WATA Company procedures, usually to site supervisor then to main office

4.6 Welfare

Use of WATA facilities, toilets, wash basins, refectory tea room and office

.

4.8 PPE

All WATA staff and all students will be required to wear hard hat, steel toe cap safety boots, high visibility jacket or high visibility vest. See Risk Assessments for more specific PPE.

4.9 Access

Site access controlled by gate

4.9.1 Pedestrians

All works to be carried out in fenced off compound area

4.10 Hazards & Risk Assessment

Various hazards have been identified as associated with the works and risk assessments have been carried out to determine the control measures required reduce the risk to an acceptable level. These are found in Appendix for Risk Assessments

List environment issues

5.0 Resources

5.1 People

Qualified Instructor

5.2 Plant

Small cement mixer

Wheelbarrow

Shovels

Small Tools

5.3 Materials

Bricks

Blocks

Lime Mortar

6.0 Methodology

  • All trainees will attend a safety briefing to discuss works
  • All identifiable hazards will be discussed prior to works commencing
  • All staff and trainees to wear suitable PPE at all times
  • Instructors will demonstrate work processes highlighting hazards and safety issues that could arise
  • Trainees will be issued tools from store and will be directed to their work area
  • Bricks will be transported from storage area to work site using a wheelbarrow
  • Mortar will be mixed using a 110volt electric mixer, the mixer will be loaded by hand and the mortar will be tipped into a wheelbarrow to be transported to the work area
  • When required bricks will be cut using a hammer and bolster or a petrol abrasive wheel cut off saw. Gloves and goggles will be used when using hammer and bolster. Gloves, goggles, ear protection and a dust mask will be worn when using the cut off saw. A water suppression kit will be employed at all times when cutting masonry
  • Suitable plywood "spot boards" will be used for mortar, the boards will be placed on short stands to lessen bending
  • Work areas will be kept clean and tidy as work progresses, broken bricks will be transported to a suitable skip, excess mortar will be scraped up and returned to the stockpile
  • All tools and plant will be cleaned and placed in the secure storage unit at the end  of each day
  • All materials will be returned to stockpile and will be safely stacked at the end of each shift

APPENDICES:

1.Risk assessments

2.Drawings



rev

Our Service Portfolio

jb

Want To Place An Order Quickly?

Then shoot us a message on Whatsapp, WeChat or Gmail. We are available 24/7 to assist you.

whatsapp

Do not panic, you are at the right place

jb

Visit Our essay writting help page to get all the details and guidence on availing our assiatance service.

Get 20% Discount, Now
£19 £14/ Per Page
14 days delivery time

Our writting assistance service is undoubtedly one of the most affordable writting assistance services and we have highly qualified professionls to help you with your work. So what are you waiting for, click below to order now.

Get An Instant Quote

ORDER TODAY!

Our experts are ready to assist you, call us to get a free quote or order now to get succeed in your academics writing.

Get a Free Quote Order Now